Acceptance Rate Trend (6 mo)
Defect Categories (Pareto)
Recent Inspections
| Record No | Type | Date | Item / Description | Ref (PO/WO) | Result |
|---|
Open NCRs
| NCR No | Date Raised | Item | Source | Disposition | Status |
|---|
| Record No | Date | Supplier | Item / Material | PO No | Qty Recd | Result |
|---|
| Record No | Date | Work Order | Stage / Operation | Work Centre | Qty Offered | Result |
|---|
| Record No | Date | Customer | Item | SO / PO No | Qty Ready | Result |
|---|
| NCR No | Date | Source | Item | Qty Affected | Disposition | Status |
|---|
| Gauge ID | Name | Type | Location | Last Cal. | Next Due | Due Status | Status |
|---|
| ITP No | Title | Customer / Project | Rev | Stages | Status |
|---|
Supplier Quality Scorecard
Computed from IQC inspection history| Supplier | Total Inspections | Accepted | Rejected | Reject-Rework | Accept Rate | Grade | Last Inspection |
|---|
Batch / Heat Traceability Search
Enter a heat, batch, or lot number to see every inspection and NCR linked to it.
Quality Summary Report
Certificate of Conformance
Customer-facing, from a Final inspectionDispatch Document Pack
Final inspection + linked IQC / in-process records for the same POITP Completion Report
Stage-by-stage status against linked inspectionsFirst Article Inspection Report (FAIR)
Formal new-part approval, built from an existing inspection's dimensional dataManagement Review Report
Quarterly rollup: trends, NCRs, COQ, calibration complianceSupplier Performance Report
Scorecard as a formal PDF for vendor reviewScrap / Non-Conforming Material Register
Everything scrapped or rejected outright, with costRework Cycle Report
Original → re-inspection pairs, with cycle timeCalibration Due List
Gauge register sorted by due date, for planningRecent Activity
| Time | Action | Record | Detail | By |
|---|
Supabase Connection
Company Details (used on PDF reports)
Your Name
Reset Local Settings
Clears saved Supabase URL/key and company config from this browser only. No inspection data is deleted.