QC Manager

Motif Engineers Pvt. Ltd. — Quality Control

Dashboard

MEPL — Quality Assurance Overview

Acceptance Rate Trend (6 mo)

Defect Categories (Pareto)

Recent Inspections

Record NoTypeDateItem / DescriptionRef (PO/WO)Result

Open NCRs

NCR NoDate RaisedItemSourceDispositionStatus
Record NoDateSupplierItem / MaterialPO NoQty RecdResult
Record NoDateWork OrderStage / OperationWork CentreQty OfferedResult
Record NoDateCustomerItemSO / PO NoQty ReadyResult
NCR NoDateSourceItemQty AffectedDispositionStatus
Gauge IDNameTypeLocationLast Cal.Next DueDue StatusStatus
ITP NoTitleCustomer / ProjectRevStagesStatus

Supplier Quality Scorecard

Computed from IQC inspection history
SupplierTotal InspectionsAcceptedRejectedReject-ReworkAccept RateGradeLast Inspection

Batch / Heat Traceability Search

Enter a heat, batch, or lot number to see every inspection and NCR linked to it.

Quality Summary Report

Certificate of Conformance

Customer-facing, from a Final inspection

Dispatch Document Pack

Final inspection + linked IQC / in-process records for the same PO

ITP Completion Report

Stage-by-stage status against linked inspections

First Article Inspection Report (FAIR)

Formal new-part approval, built from an existing inspection's dimensional data

Management Review Report

Quarterly rollup: trends, NCRs, COQ, calibration compliance

Supplier Performance Report

Scorecard as a formal PDF for vendor review

Scrap / Non-Conforming Material Register

Everything scrapped or rejected outright, with cost

Rework Cycle Report

Original → re-inspection pairs, with cycle time

Calibration Due List

Gauge register sorted by due date, for planning

Recent Activity

TimeActionRecordDetailBy

Supabase Connection

Company Details (used on PDF reports)

Your Name

Reset Local Settings

Clears saved Supabase URL/key and company config from this browser only. No inspection data is deleted.